Skip to main content
TRIUMF : Canada's particle accelerator centre
Canada's particle accelerator centre
Centre canadien d'accélération des particules
Home
Login
Research Program
Technical Services
Administration
Quick Links
Login
You are here
Home
Celebrating 40 Years of TRIUMF: 1969-2009
Celebrating 40 Years of TRIUMF: 1969-2009
Celebrating 40 Years of TRIUMF: 1969-2009
3.141 Cyclotron Vacuum Tank (labeled)
7. TRIUMF Volleyball Champions, 1986
5. Joe Clark Visits TRIUMF, 1989
6.6 PET Scan
3.12 Cyclotron Superstructure Completed
3.13 Vault Roof Beams
3.03 The Central Region Model Cyclotron
5. Stan Hagen and Kim Campbell
2.9 Aerial View of TRIUMF
2.8 Aerial View of TRIUMF
2.7 Aerial View of TRIUMF
4.B2 ISAC Rebuncher
6.5 Installing New PET Scanner
6.4 Retiring the Original PET Scanner
3.15 Dr. Richardson tunes up the first beam
1. Tree Planting
5. Prince Charles at TRIUMF, 1980
5. Prince Charles in the Meson Hall
5. Japanese PM's visit, 1989
5. Cecil Green meets PAC MAN
4.C2 8Pi
2.5 Construction Site
2.4 Construction begins, 1970
3.05 Cyclotron Vault Construction
3.04 Central Region Model Ion Source
4.D2 Twin Quadrupole Magnet for the LHC
7. Hockey Team 1982
6.2 TR13 Cyclotron
4.B3 ISAC Drift-Tube Linac
6.9 Proton Therapy
4.A0 Proton Hall 1974
4.A1 MRS Spectrometer
4.A5 M15 Muon Beamline
4.A6 M20 Muon Beamline
4.A4 Setting up Experiments on Pion Beamlines
4.B5 ISAC Superconducting Linac Module
4.B4 ISAC Superconducting Linac Module
6.3 PET group and original scanner
40!
2.6 Constructing the Cyclotron Building
4.A2 Meson Experimental Hall
2.1 TRIUMF Site Prior to Construction
1. Audience for the Tree Planting
1. Audience, tree and pansy cyclotron
1. Audience for the Tree Planting
6.7 Pion therapy
4.A7 Time Projection Chamber
3.10 Cyclotron vacuum tank base
7. Christmas 1969
4.D4 ATLAS Tier-1 Data Centre
4.D3 ATLAS Tier-1 Data Centre
4.E2 Welcome to TRIUMF
4.E1 Welcome to TRIUMF
4.C3 The TITAN Ion Trap
3.14 Inside the cyclotron vacuum tank
1. 1969, Dedication and Tree Planting
1. Tree Planting Ceremony
3.08 Lower magnet sectors, 1971
5. The Queen visits the PET scanner, 1983
3.01 1966 magnet studies
3.11 Cyclotron magnet completed
4.B1 The ISAC RFQ accelerator
3.17 TRIUMF Main Control Room
2.2 The Vogt Leap
4.C4 DRAGON exotic atom separator
3.02 Cyclotron magnet model
3.07 Cyclotron Vault
3.06 Rebar for cyclotron vault floor
3.09 Cyclotron magnet and staff, 1972
5. PM Trudeau at TRIUMF
6.1 PET pipeline II
4.A3 Meson Hall looking towards Cyclotron
6.0 PET Pipeline I
5. Japanese delegation to M9 Upgrade
3.16 Celebrating the first 500-MeV beam
6.8 Pion therapy control panel
2.3 Excavation complete: 1970
4.A9 CHAOS pion spectrometer
4.A8 Detector
4.D1 CERN PS cavity model
4.C1 8-Pi Detector
1. Pépin speech