To support the on-going cyclotron cabling upgrade effort. This encompasses design and installation of the parallel cable tray network and any additions over time, as well as routing and managing the installation of the cables themselves. It is anticipated that most of the cables will replace existing cables already servicing the cyclotron. Our mission includes documenting each cable in an online database.
Cabling Resources On Site:
Beamlines Group | Site cabling | Bruno G | 6525 |
Diagnostics Group | Beam monitors | Dave C | 7482 |
Electrical Services | Primary wiring | Razvan C | 6269 or |
RFS link Electronics Services | Controls | Hubert | 7448 |
Experimental Facilities | Experiments | Robert H | 7383 |
Network Services CAT5 cabling | Len H | 6507 or | |
Helpdesk link Safety Group | Radiation monitoring | Noel G | 7458 |
Vault Recabling Group | Cyclotron recabling | Helpdesk link |
On-Site Services | Companies TRIUMF works with | ||
Vault Cabling (docushare)
|